Project Description
Tagish Engineering Ltd. was commissioned to replace an aging lift station located within the Village of Clive. The project included the removal of the original dry well and wet well system and replace it with a new modernized wet well pumping system. The lift station receives flows from a 375mm gravity main and pumps the effluent through a 250mm HDPE force main. The project also include the supply and installation a new portable building to house the lift stations electrical equipment. A new standby diesel genset was also included into the project scope to power the system during power failures.
Location
Village of Clive
Sectors
Highlights
New 6.6m deep wet well lift station
Supply of new 14kW Diesel Standby Genset