Project Description
Tagish Engineering was a part of the design team on this project to construct a new commercial centre within the Capstone area in the City of Red Deer. Tagish's responsibilities included the site design, selecting a building elevation, and preparing a detailed utilities plan on how the building was to be serviced with water, wastewater and stormwater services. Additionally, a detailed grading plan was designed for the site, which included parking lot grades. A storm water management plan was also prepared for the site that compared pre-development and post development runoff volumes in order to limit the downstream impacts the site had once construction was complete. Tagish was able to prepare a site plan that a comfortable parking lot grades while still meeting the stormwater detention requirements set by the area.
Location
Berry Architecture
Sectors
Highlights
Existing Conditions Plan
Utilities Plan
Site Grading Plan
Storm Water Management Plan